2016年11月北京學位英語真題及答案

學位英語 責任編輯:胡陸 2019-07-08

摘要:學位英語真題是最好的復習資料,如果你想通過學位英語考試,那就著重做歷年真題。以下是為大家整理的北京地區(qū)2016年11月份的成人本科學士學位英語真題及答案。

I. Reading Comprehension

Passage 1

If Dakota Access Pipeline (輸油管道) completed, it will carry nearly half a million barrels of oil across four states every day. Energy Transfer Partners (ETP), a Texas-based company behind the $3. 8 billion project hopes to finish construction this year. But the Standing Rock Sioux, an American Indian tribe (部落), is determined to stop the 1,172-mile pipeline from being built. (76) Both sides show no signs of backing down.

The Dakota Access Pipeline was announced in 2014. A section of it will run near the Standing Rock Sioux reservation. A reservation is an area of land set aside for American Indians. The tribe says the construction threatens to destroy historical areas and ancient burial sites. They also say the pipeline could pollute their main water source, the Missouri River. In April, the Standing Rock Sioux began a protest against the project. They camped at the construction site. Since then, thousands of people, including people from other American Indian tribes, have traveled to the side to join the protest.

ETP says that the pipeline will have built-in measures to protect against oil leaks. Workers will also monitor it remotely, and will be able to close valves (閥) within three minutes if leaks are detected.

American Indians have been staging a nonviolent protest for months. The protest took a turn last week when police were called to keep the peace between protesters and armed security guards hired by the company.

(77) Twenty-eight people have been arrested since then and charged with interfering with the pipeline construction.

1. Which of the following is the main idea of the passage?

A. The Dakota Access Pipeline will create more markets for oil and gas.

B. The Dakota Access Pipeline will create many job opportunities.

C. American Indians oppose the construction of an oil pipeline.

D. American Indians fight for equal voting rights.

2. ETP hopes to finish this project in _____.

A. 2016        B. 2017       C. 2018        D. 2019

3. Why do American Indians protect against the construction of this pipeline?

A. Because it will cost up to $3.8 billion.

B. Because it threatens the region’s water supply.

C. Because it will make many people lose their jobs.

D. Because it will force many people to leave their homes.

4. According to the passage, the workers can _____ in case of pipeline leaks.

A. report to the local government            B. ask people to leave the leak affected areas

C. call 911                              D. close valves

5. According to the passage, which of the following statements is NOT TRUE?

A. This pipeline will cross four states.

B. This pipeline is 1,172 miles long.

C. All the protesters are from the Standing Rock Sioux.

D. Neither sides of the dispute is willing to compromise.

相關推薦:

全國學位英語成績查詢入口

成人學士學位英語過關技巧

希賽網(wǎng)為幫助參加學位英語考試的考生備考,特設培訓視頻教程學位英語學習包等各項助力措施,更多備考通關方案盡在希賽網(wǎng)學位英語考試頻道。

更多資料
更多課程
更多真題
溫馨提示:因考試政策、內容不斷變化與調整,本網(wǎng)站提供的以上信息僅供參考,如有異議,請考生以權威部門公布的內容為準!

學位英語備考資料免費領取

去領取

距離2021 學位英語考試

還有
  • 0
  • 0
  • 0
考試

QQ群:701601765

查分

各地不同

專注在線職業(yè)教育24年

項目管理

信息系統(tǒng)項目管理師

廠商認證

信息系統(tǒng)項目管理師

信息系統(tǒng)項目管理師

!
咨詢在線老師!