北京PMI-ACP®考試時長是多久

PMI-ACP® 責(zé)任編輯:粟玉瓊 2020-06-11

北京PMI-ACP®考試時長為3小時,從上午9點到12點結(jié)束。

PMI-ACP®考試題量:由200道選擇題組成,其中有25道是預(yù)備題,預(yù)備題不影響考生成績,隨機分布在整套試題中。

PMI-ACP®考試題型:四選一的單項選擇題。

PMI-ACP®考試例題參考:

During the fifth sprint review, the team obtains the product owner’s sign-off on all features.However, the product owner notices that two features developed and accepted during the second the sprint no longer work correctly. As new features are developed, the discovery of failures in previously developed features has become frequent.

What should be done to control this?

A. The scrum master should reprimand the team.

B. During the next sprint, the team should fix all issues before beginning any new features.

C. An automation test should be included as part of the definition of done so that new features are continuously tested.

D. During the retrospective, the team should identify the developer responsible for causing these failures.

在第五次 sprint審查期間,團隊獲得產(chǎn)品負責(zé)人對所有功能的簽署同意。但是,產(chǎn)品負責(zé)人注意到在第二次 sprint期間開發(fā)和驗收的兩個功能不再正常工作。隨著新功能的開發(fā),在之前開發(fā)的功能中,故障出現(xiàn)的越來越頻繁。

若要控制這個問題,事先應(yīng)該怎么做?

A、 scrum主管應(yīng)該譴責(zé)團隊。

B、在下一次 sprint期間,團隊?wèi)?yīng)該在開始任何新功能之前解決所有問題。

C、應(yīng)包含自動化測試。作為已完成定義的一部分,以便能夠不斷測試新功能。

D、在回顧會議上。團隊?wèi)?yīng)找出為導(dǎo)致這些故障負責(zé)的開發(fā)人員。

更多資料
更多課程
更多真題
溫馨提示:因考試政策、內(nèi)容不斷變化與調(diào)整,本網(wǎng)站提供的以上信息僅供參考,如有異議,請考生以權(quán)威部門公布的內(nèi)容為準!

PMI-ACP®備考資料免費領(lǐng)取

去領(lǐng)取

專注在線職業(yè)教育24年

項目管理

信息系統(tǒng)項目管理師

廠商認證

信息系統(tǒng)項目管理師

信息系統(tǒng)項目管理師

學(xué)歷提升

!
咨詢在線老師!